Skip to content

Turbine Cowboy

Sections
Personal tools
You are here: Home » Field Engineering - The 100 First Years

Field Engineering - The 100 First Years

Up one level
Genenal Electric field engineering celebrated 100 years of service in 1994. A Commenerative booklet was published with many stories and photographs chronicling the history. Some of them appear herein.
Field Engineering - The 100 First Years History of Field Engineering (1894-1994)
Photos of former field engineers and managers.
Field Engineering - The 100 First Years The Kilowatt Machines
The original frame 3 gas turbines. They were 5000 KW generator drives. Gas turbines were intercooled compressor and regenerative cycle, dual fuel units.
Field Engineering - The 100 First Years Vintage Steam & Gas Turbines
 
Field Engineering - The 100 First Years A Steam Turbine and Generator Atop Another
Unique installation of two steam turbines.
Field Engineering - The 100 First Years Turbine being overhauled at Ford (Installed 1931)
 
Field Engineering - The 100 First Years Rutland on the Leading Edge
MS3001 gas turbines, intercooled, regenerative-cycle, dual fuel rated at 4000 kilowatts each.
Field Engineering - The 100 First Years The Field Engineer and His Work
The first GE field engineer, W.G. Ely from the early 1900s.
Field Engineering - The 100 First Years Schenectady World Champs in Basketball in 1906
Men from Schenectday win World Basketball Championship in 1906/
Field Engineering - The 100 First Years 100 Years of Field Engineering
 
« September 2017 »
Su Mo Tu We Th Fr Sa
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
 
 

Powered by Plone

This site conforms to the following standards: